When civil engineering contractor Kier was constructing a fish pass as part of major environmental works on the River Severn, we supplied a bespoke groundworks support package. During the course of the works, this package had to respond to the design changes imposed by the local geology, as well as the load conditions and sequencing of the works.
Our temporary works solution for the Lincomb Fish Pass project centred on the use of a robust cofferdam design, enabling the safe propping and excavation of the 75-metre-long structure. We supplied Super Shaftbrace frames with continuous walers running the full length of the excavation, supported by 21 Super Bracing Struts, along with hydraulic pumps and ancillary equipment.
This high-capacity system ensured the sheet pile walls were securely retained while excavation and construction took place. As work progressed, an unexpected layer of siltstone bedrock prevented the piles from reaching the intended depth, prompting our engineering team to quickly adapt the scheme by introducing a revised lower-level support arrangement.
View Supershaft Plus
To maintain flexibility during construction, our workshops produced bespoke sacrificial waler sections that could be welded to the sheet piles and safely removed later without causing damage. This adaptability proved vital when on-site conditions required rapid design adjustments to maintain safety and progress.
By working closely with Kier’s project team, we swiftly modified the propping arrangement from a single line of higher-level props to a dual-level system, ensuring continued structural stability. Our collaborative and responsive approach helped to minimise disruption, safeguard workers, and keep the project on track—ultimately supporting the successful delivery of this vital environmental restoration scheme.
Get in touch
For all project specific design and technical enquiries, please contact your local service team
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
action@mabeyhire.co.uk
“A solution was required at Lincomb Fish Pass to resist ground pressure before the base slab was installed to achieve the required strength. Mabey Hire came back to us with the best solution. They were very quick to respond and worked collaboratively with the project team to ensure safety and minimise any project delays.”