- Project
- History Centre, Durham
Crossness Sewage Treatment Works, London
| Location |
|
|---|---|
| Sector | Water |
| Products |
As part of Thames Water’s major projects work, a new final effluent pumping station was required at the Crossness Sewage Treatment Works (STW), helping to cope with higher river levels. Our temporary groundworks solutions were called upon to facilitate this work.
To ensure the safe construction of the new below-ground effluent pumping station at Crossness STW, Mabey Hire designed and supplied a comprehensive groundworks support package for MAL Contractors. Given the significant excavation depth, the solution utilised high-capacity Super Bracing Struts (SBS 600 range) and Supershaft Plus systems to provide robust lateral support and maintain excavation stability.
This combination allowed the MAL team to safely work within the deep pit while supporting the heavy ground loads surrounding the site. The equipment was straightforward to install, and thanks to early coordination with the principal contractor, the transition to on-site operations was smooth and efficient.
View Super Bracing Strut
As works progressed, unexpected issues arose, including misaligned sheet piles installed by a previous contractor. Mabey Hire quickly redesigned sections of the trench wall to include additional welds and supplied an 18-metre replacement beam to overcome installation challenges.
This responsive design adaptation minimised disruption and kept the project on schedule. The collaborative relationship between Mabey Hire and MAL Contractors ensured the temporary works were executed safely, efficiently, and with minimal delay—supporting the successful delivery of the new pumping station while maintaining the highest safety standards on site.
Get in touch
For all project specific design and technical enquiries, please contact your local service team
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
action@mabeyhire.co.uk
“We have found the support that Mabey Hire offer to be extremely helpful, with any issues resolved in a timely and effective manner. This has helped us to coordinate our contracted works with minimal delay and, most importantly, keep our onsite workers safe whilst carrying out construction of the new station.”