Temporary bridge protects Scotland’s rural landscape during major Project VISTA works
Killin, Scotland
Project Overview
| Location |
|
|---|---|
| Sector | Power & Energy |
| Products |
During a major initiative to remove electricity transmission lines impacting some of the most scenic landscapes across Scotland’s National Parks, our temporary bridging solutions played their part in enabling the works.
Our solution
To support Project VISTA’s work in relocating overhead power lines underground, Mabey Hire designed and supplied a 45-metre temporary bridge using its modular Universal bridging system.
The bridge was installed to divert heavy construction traffic away from the narrow historic bridge in Killin, protecting both the structure and the surrounding environment within Loch Lomond and The Trossachs National Park. Designed to handle vehicles of up to 55 tonnes, including cable drum trailers and tractors, the bridge provided a safe and efficient access route for construction activities while minimising disruption to the local community and visitors.
View Mabey Universal Bridge
Working closely with Morgan Sindall Infrastructure, Baker Hicks, and the National Park Authority, Mabey Hire contributed from the early planning stages, providing technical input and visual demonstrations of the installation process.
With abutments pre-built by Morgan Sindall, the modular bridge sections were assembled and launched in just three weeks using on-site machinery. Featuring a 4.5 metre wide roadway, the bridge is one of the largest of its kind deployed in the UK and will remain in place for 62 weeks to facilitate the underground cabling works, helping ensure the safe and smooth delivery of this major landscape enhancement project.
Get in touchProject images
Related news and projects
- Project
- Leeds to Liverpool Canal, Ormskirk
Trench sheets provide edge protection to canal
- Project
- Barmouth, Wales
150-year-old bridge brought back to life with innovative bridge lift
Give us a call
For all project specific design and technical enquiries, please contact your local service team
Send us an email
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch
action@mabeyhire.co.uk
“As a contractor covering a wide range of project types, we’ve worked with Mabey Hire on many occasions in the past. There are very few competitors who could have supplied the size of bridge required for the Killin VISTA project. Mabey Hire shared its time lapse footage of past installations with the project team here during the tendering phase, which was very insightful, and the Mabey Universal bridge installed over the river has been specified to cope with heavy construction traffic, including low-loaders and the cable lorries. The work has gone well.”